Road Closing Update CORRECTION: Whitman Boulevard & Canterbury Road (the South 3-way stop intersection) 
Monday March 5, 2018 the East Side Sewer Relief Project on Whitman Boulevard has progressed to the Canterbury Road intersection that is the 3-way stop and at 242 Whitman Blvd.
The contractor will be closing Whitman Blvd at Canterbury Road the south 3-way intersection today to install a bypass pump. This intersection will be reopened as one-lane once the pump is installed. Canterbury Road traffic should access at the 4-way intersection to the north.
All addresses higher than 242 Whitman Boulevard, traffic will need to access from the east using Abbe Road. All addresses west of 242 Whitman Blvd, traffic will need to access from the west using Gulf Road. There is no pass through for any vehicle at this location of the project.
Watch out for slow-moving heavy construction vehicles that operate on Gulf Road between the Waste Water Plant and Whitman Boulevard.
Address/Location
City of Elyria Ohio
131 Court St
Elyria, OH 44035
Contact
Emergency: 9-1-1
Non-emergencies: 440-326-1400