City Street Resurfacing Project Schedule
The City’s annual Slurry Seal Resurfacing Project is underway and, weather permitting, it will be completed in early August.
Construction hours will be Monday through Friday, 7:00 am to 5:00 pm.
July 8 to July 17: Mobilization and street preparation
July 18 to July 24: Slurry seal resurfacing and temporary street closures
July 31 to August 6: Striping and pavement marker installation
Street preparation will include vegetation removal, crack sealing, asphalt repairs, valve and manhole covering, and striping removal.
Streets will be temporarily closed for at least five hours to allow the slurry seal resurfacing to set.
American Asphalt South will post temporary No Parking signs on a street at least 72 hours before it is slurry sealed.
For any questions or assistance, please contact:
1. Jeri Grant, American Asphalt South, Inc. (909) 427-8276
2. Floriza Rivera, City of El Segundo (310) 524-2361
Address/Location
Alert El Segundo
348 Main St
El Segundo, CA 90245
Contact
Emergency: 9-1-1
Non-emergencies: 310-524-2200
Floriza Rivera
City of El Segundo
[email protected]
310-524-2361
TEXT-A-TIP - Text TIP ELSEGUNDO followed by your message, to 888777