Bel-Aire Subdivision Sewer Lining Construction
It is anticipated that cleaning and televising various parts of the sanitary sewer system within the Bel-Aire Subdivision will begin on Monday, May 4th (weather permitting). The affected sewer for this work is along the following streets: Leelane (between Orchard Lake and Lamar), Folkstone, Beacon, Marblehead (between Colchester and Beacon), Lamar, and Colchester. Additionally, the sewer between Valley View Circle and Riverview Ct. will be cleaned and televised as well.
Due to the potential for the cleaning equipment to produce higher pressures, we advise residents to keep their toilet lids shut so that water does not “blow” up from the toilet. There are minimal inconveniences, if any, to residents and two-way access will be maintained
along all roads.
In accordance with the CDC Guidelines on COVID-19, OHM Advisors and the City will hold a virtual public meeting on Thursday, April 30th at 6:00 pm via Zoom meetings. Please use the following information to access the meeting:
Join Zoom Meeting @ https://ohm-advisors.zoom.us/j/668398345
Password: 028910
Join by Telephone: +1 646 876 9923 US
Meeting ID: 668 398 345
Password: 028910
Please keep children and pets away from the construction operation. Construction activities, and the associated equipment that goes with it, is attractive to small children and can be dangerous. Please keep children away from the equipment, removals, mass grading, hot asphalt, and wet concrete.
If you have any specific questions regarding the road construction, such as scheduling, parking or access, please call Mr. Chuck Eudy, DPW Superintendent, at (248) 473-7250, or Ms. Jessica Howard, Project Engineer for OHM, at (248) 751-3114.
Address/Location
City of Farmington MI
23600 Liberty St
Farmington, MI 48335
Contact
Emergency: 9-1-1
Non-emergencies: 248-474-4700