Advisory
Mt. Calvary Road
The concrete for Mt. Calvary Road, between K-63 and North Second Street, is scheduled to start being poured tomorrow (6-24-21). For some of the pour, hopefully starting at 6:30 a.m., there be will traffic control on K-63 near the intersection of Mt. Calvary Road - as some of the concrete needs to be poured from the west.
Address/Location
City of St Marys, KS
200 S 7th St
Saint Marys, KS 66536
Contact
Emergency: 9-1-1
Non-emergencies: 785-437-2311