Advisory
POOL OPENING POSTPONED TO SATURDAY, JUNE 25TH DUE TO MECHANICAL FAILURE
The opening of the Borough pool, scheduled for Saturday, June 18th must be postponed due to a mechanical failure of the main circulation pump. Emergency repairs are currently underway and it is expected that the pool will be open on Saturday, June 25th. Any further uptates will be shared as soon as possible via Nixle alerts and the Borough social media page.
Address/Location
Borough of Washington, NJ
100 Belvidere Ave
Washington, NJ 07882
Contact
Emergency: 9-1-1
Non-emergencies: 908-689-3600
TEXT-A-TIP - Text TIP WASHBORO followed by your message, to 888777