Community
Additionally, the Borough of Fair Haven Streetscape work is continuing between Hance and Smith Street, but no road closures are planned at this time.
RIVER ROAD WATER MAIN REPLACEMENT PROJECT UPDATE
For the week of JULY 4. . .
For the week of July 4, New Jersey American Water does not have any pending work along River Road, however, our contractor will be performing final pavement restoration on side streets in Rumson.
During paving, these side streets will be temporarily closed between 7 a.m. and 5 p.m. The following side streets are scheduled for paving Tuesday- Thursday, weather permitting:
- Lafayette St. (Both sides).
- Washington St. (Both Sides).
- Allen St.
- 1st. St.
- 2nd St. (Both sides).
- 3rd St. (Both sides).
- Bellevue Avenue
Additionally, the Borough of Fair Haven Streetscape work is continuing between Hance and Smith Street, but no road closures are planned at this time.
Address/Location
Borough of Fair Haven
748 River Rd
Fair Haven, NJ 07704
Contact
Emergency: 9-1-1
Non-emergencies: 732-747-0241