**WWPD Traffic Advisory: M-F 9a-5p for 111 days on Cranbury Rd btwn Stobbe Ln and Steele Drive starting 5/15/2023 
TRAFFIC ADVISORY--Cranbury Road Sidewalk Project Phase 2B to Begin On or About May 15, 2023
West Windsor Township announces that construction of new sidewalk, curb, and drainage along Cranbury Road between Stobbe Lane and Steele Drive (see map), will start on or about Monday May 15, 2023, weather permitting. CMS Construction will be modifying a portion of the intersection of Cranbury Road with Millstone Road, installing ADA curb ramps, crossswalks, and other concrete sidewalks and curbs, followed by limited pavement repairs and a new porous asphalt sidewalk. Work will continue over a contract duration of 111 calendar days, weather permitting.
Construction will occur between the hours of 9 am to 5 pm, Monday through Friday. During this time portions of the roadway will be reduced to a single lane with alternating traffic during work hours. Normal traffic flow will resume outside of designated work hours. Please honor all temporary traffic control measures for your safety and the safety of others. --WW Township Engineer Guzik
Det. Lt. Lee #59
Instructions:
**WWPD Traffic Advisory: M-F 9a-5p for 111 days on Cranbury Rd btwn Stobbe Ln and Steele Drive starting 5/15/2023
Address/Location
West Windsor Police Department, NJ
271 Clarksville Rd
West Windsor Township, NJ 08550
Contact
Emergency: 9-1-1
Non-emergencies: 609-799-1222
TEXT-A-TIP - Text TIP WWPD followed by your message, to 888777
Alert Details
- Severity:
- Minor - Minimal to no known threat to life or property
- Urgency:
- Expected - Responsive action SHOULD be taken soon (within next hour)
- Certainty:
- Observed - Determined to have occurred or to be ongoing
- Category:
- Public and private transportation
- Event:
- Travel Warning