Advisory
All connections MUST be complete prior to April 30, 2024. No road opening permits will be issued after that date.
Once the roadways are paved, there will be a 5-year moratorium put in place and no gas connection permits will be issued during that time.
Thank you for your attention to this.
Final call to connect to Elizabethtown natural gas service on certain Township roadways
Please take notice that this is the final call to connect to Natural Gas prior to road resurfacing on the following Township roadways:
- Stonehedge Lane
- Manor Drive
- Mayfair Lane
- Bridge Lane
- Sandra Lane
- Catalina Drive
- Camelot Drive
- Birch Parkway
All connections MUST be complete prior to April 30, 2024. No road opening permits will be issued after that date.
Once the roadways are paved, there will be a 5-year moratorium put in place and no gas connection permits will be issued during that time.
Thank you for your attention to this.
Address/Location
BYRAM TOWNSHIP
10 Mansfield Dr
Stanhope, NJ 07874
Contact
Emergency: 9-1-1
Non-emergencies: 973-347-2500