Thursday 4/04 Roadway Milling - Robinwood & Beechwood
On Thursday April 4th from 7:00am until approximately 3:00pm Milling operations are scheduled to resume to the following roadways.
Robinwood Road from Washington Avenue to Sycamore Lane
Beechwood Drive from Spice Drive to Washington Avenue
The paving contractor has posted temporary no parking signs in the area so that all vehicles are off of the roadway during the projected work hours. Residents in the area are asked to move their vehicles out of their driveway and onto a neighboring street if they plan to travel to or from their home during the projected work hours. Vehicular traffic will be limited in the area while work takes place. Area residents may need to park outside of the work zone while work is being conducted.
Address/Location
Township of Washington
350 Hudson Ave
Township of Washington, NJ 07676
Contact
Emergency: 9-1-1
Non-emergencies: 201-664-4404