Anticipated Traffic Delays on D Street Bridge and Maria Dr/E. Washington Friday, 7/19
Please be advised of the following potential traffic delays:
1. D Street Bridge Opening Scheduled for 7/19/24
The Turning Basin Dock Replacement project is in full swing, and our contractor will be moving equipment out of the Petaluma River. The D Street Bridge is scheduled to open twice between the hours of 5:00-6:00pm on Friday, July 19th. Please plan to use alternate routes as we anticipate increased traffic in the area with delays of up to 25 minutes with each bridge opening.
2. Paving at Maria Dr. and E. Washington
Maria Dr. and E. Washington will have paving work being done between 7:00-11:00pm on Friday, July 19th. E Washington traffic will be allowed to pass through the junction with lane modifications. We will not be able to turn from or onto Maria. Flaggers and traffic control measures will be in place.
Address/Location
Petaluma Police Department
969 Petaluma Blvd N
Petaluma, CA 94952
Contact
Emergency: 9-1-1
Non-emergencies: 707-778-4372
TEXT-A-TIP - Text TIP PETPD followed by your message, to 888777