TRAFFIC ALERT: Post Road, Traffic/Paving Alert
The State of Connecticut Department of Transportation (DOT) has started milling and paving on Post Road, from Granville St to Eliot Place.
Schedule:
- Nightly, excluding Saturday nights.
- Milling/Paving: 7 PM to 5 AM
- No Parking: 6 PM to 6 AM - Vehicles parked in violation will be towed at the owner's expense.
Sequence of Work: Milling/Paving will be sequenced into the following sections of roadway. Contractors will complete one section each night. Milling will be completed along the entire length of the roadway prior to paving.
- Granville St to Ruane Street
- Old Post Road to the area of the Brick Walk
- Brick Walk to Eliot Place
Use Caution:
- Traffic will be reduced to one lane in each direction.
- Road surfaces will be uneven and rough.
- Paving will follow the same sectioning/sequencing as milling.
Businesses Remain Open!
Businesses remain open during this period! Please utilize alternate parking available behind many businesses, at the Sherman Green, and at the Fairfield Train Station.
We appreciate everyone's patience and cooperation during this time.
Thank you!
The above map is for reference only and is not meant to be an exact portrayal of the area being milled/paved nor of the exact sequence of work being completed.
Sent on: 07-25-2024 10:42:20
Address/Location
Town of Fairfield CT
611 Old Post Rd
Fairfield, CT 06824
Contact
Emergency: 9-1-1