West Fleming Pike Construction Schedule & detours
The 2-week outlook for August 26th through August 29th and September 3rd through September 6th is as follows: Construction along West Fleming Pike will entail installation of storm drainage and inlets utilizing a detour from Route 73/Mr. Bills to the Atlantic City Expressway EB off-ramp at Exit 33. During this phase of the detour, the Expressway off-ramp will remain open.
Traffic exiting the off-ramp will be diverted right, (WB), on West Fleming Pike to follow the posted detour. The hours of work will be 7 AM to 5 PM each day/shift. Schedule is weather permitting.
Please follow posted detours during construction.
Address/Location
Township of Winslow
125 South Route 73
Hammonton, NJ 08037
Contact
Emergency: 9-1-1
Non-emergencies: 609-567-0700
TEXT-A-TIP - Text TIP WINSLOW followed by your message, to 888777