One More Shorewood Blvd Closure 
Madison Sewer will need Shorewood Boulevard closed between Locust Drive and Tally Ho Lane one last time. Starting on Monday morning, September 8 Shorewood Blvd will be closed through Wednesday, September 10. The usual detour to Western Road and Tally Ho Lane will be in effect with no parking signs posted on each street for those 3 days. The traffic control plan is attached to this message (it is similar to previous traffic control plans from last fall and earlier this summer). This will be the final closure for Shorewood Blvd.
Thank you for your patience during the three-year long sewer project.
Address/Location
Village of Shorewood Hills
801 Shorewood Blvd
Madison, WI 53705
Contact
Emergency: 9-1-1
Non-emergencies: 608-267-1110
TEXT-A-TIP - Text TIP VOSH followed by your message, to 888777
