Advisory
Raising Castings and Paving Roads - Windflower Bay
Raising Castings and Paving Roads - Windflower Bay 
Be advised that Castings will be raised in the Windflower Bay Subdivision scheduled to take place Friday (9/5) and Saturday (9/6).
Paving will begin Friday (9/5) and Monday (9/8) weather permitting.
Traffic will be controlled by signs and flaggers, and delays should be expected.
Address/Location
City of Norton Shores
4814 Henry St
Norton Shores, MI 49441
Contact
Emergency: 9-1-1
Non-emergencies: 231-798-4391