Milling and Paving Project
Tilcon is finishing up their first day of milling and will resume tomorrow through June 5th. They completed milling 29th Street and due to the minimal pavement thickness, have exposed the underlying stone base course in many areas. The Borough recommends that motorists avoid these roadways and/or drive with caution so they don’t kick up the loose stone(s). Thank you for your anticipated cooperation.
Instructions:
Be careful
Address/Location
Borough of Fair Lawn
8-01 Fair Lawn Ave
Fair Lawn, NJ 07410
Contact
Emergency: 9-1-1
Non-emergencies: 201-796-1700
TEXT-A-TIP - Text TIP 07410 followed by your message, to 888777
Alert Details
- Severity:
- Minor - Minimal to no known threat to life or property
- Urgency:
- Immediate - Responsive action SHOULD be taken immediately
- Certainty:
- Observed - Determined to have occurred or to be ongoing
- Category:
- General emergency and public safety
- Event:
- Road Closure
