Construction begins on Monday 11/16 on Fountain Ave.. Plan alt. routes.
On Monday 11/16, utility work will resume on Fountain Ave. between Gerome Ave. and the By-Pass. Fountain Ave. will be closed in both directions and the By-Pass will be reduced to one lane only NB (travelling towards Jacksonville Rd.). Motorists travelling on Fountain Woods Rd. towards the By-Pass will be permitted to turn either left and right onto the By-Pass. This work, which may last the entire week, is the final phase of the construction. Motorists are urged to use caution and reduce speeds while travelling thru the work zone. We apologize for any convenience. Inquiries can be directed to the Office of the Township Engineer at 609-239-5836.
Address/Location
Burlington Township Police Department
851 Old York Rd
Burlington Township, NJ 08016
Contact
Emergency: 9-1-1
Non-emergencies: 609-386-2019
TEXT-A-TIP - Text TIP BURLTWP followed by your message, to 888777
