Manchester, NH: City
Friday April 19th, 2024 :: 03:04 p.m. EDT

Advisory

Christian Brook Sewer Separation, Contract 2 - Week of April 22 - April 26

Park Construction Corporation will continue construction activities on the sewer separation project during the week of April 22nd through April 26th .
 
Crew 1: Park Construction will be adjusting sewer and drain structures and lowering water and gas valves in preparation for roadway reclamation on Oak Street between North Street and Salmon Street; and on Salmon Street between Maple Street and Russell Street.
 
Crew 2: Continental Paving will reclaim Oak Street and Salmon Street as described above then grade and level the street in preparation for paving. Paving will be performed once subgrade preparation is completed.
 
Crew 3: Capitol Rock with assistance from Park Construction will begin drilling and blasting ledge for the new drainage piping on Oak Street starting at North Street.
 
If you have any questions, please reach out to the project team.
 