Christian Brook Sewer Separation, Contract 2 - Week of November 4 - November 8
Park Construction Corporation will continue construction activities on the Christian Brook Sewer Separation project during the week of November 4th through November 8th .
Crew 1: Will continue installing drainage pipe on Carnegie Street between Hall Street and Belmont Street. Water services will also be installed on Carnegie Street between Ashland and Dallaire Streets. Carnegie Street will be closed to through traffic with detour signage and police details on site to direct traffic around the construction zones. This crew will then move to Sagamore Street and continue installation of drainage piping and catch basins between Hillcroft Road and Skyview Road
Crew 2: Will be lowering catch basins and manhole structures on Webster Street between Oak Street and Maple Street then Continental Paving will reclaim that block of Webster St. Webster Street will be closed between Maple Street and Oak Street with detour signage and police details to direct traffic around the construction zone. The crew will also be lowering manhole and catch basin frames and covers in preparation for paving on Sagamore Street, Blodgett Street and High Ridge Road.
Crew 3: Continental Paving will be reclaiming the following streets: Joe English Lane, Webster Street (as noted above), Sagamore Street between Belmont Street and Skyview Road, Blodget Street between Skyview Road and Birchwood Street and High Ridge Road south of Blodget Street in preparation for paving.
If you have any questions, please reach out to the project team.