Advisory
CMOM Program Contract 5 Road Work Notice: 8/11/2025 - 8/15/2025
Client: Environmental Protection Division, Dept. of Public Works (DPW)
Road Closures & Work Details:
FBM Materials Lot - 257 Mammoth Rd. (Mon-Fri): No road closures expected. Some construction traffic on Mammoth Rd. for drainage culvert repair.
Lining Schedule - Traffic maintained or detoured as needed:
Sincerely,
Environmental Protection Division
Department of Public Works
City of Manchester
CMOM Program Contract 5 Road Work Notice: 8/11/2025 - 8/15/2025 
Road Work Notice
Date: Monday, August 11 thru Friday, August 15, 2025
Times:
- FBM Materials (257 Mammoth Rd.): 7:00 a.m. – 3:00 p.m. (Mon-Fri)
- Lining Locations: 7:00 a.m. - 5:00 p.m. (Mon-Thu)
Client: Environmental Protection Division, Dept. of Public Works (DPW)
Road Closures & Work Details:
FBM Materials Lot - 257 Mammoth Rd. (Mon-Fri): No road closures expected. Some construction traffic on Mammoth Rd. for drainage culvert repair.
Lining Schedule - Traffic maintained or detoured as needed:
- 8/11: Massabesic St. (Clifford Ave. to Summer St.) - Lines 9 & 40
- 8/12: Silver St. (Wilson St. to Lincoln St.) - Line 3
- 8/13: Silver St.
- (Wilson St. to Hall St.) - Line 7
- (Wilson St. to Lincoln St.) - Line 2
- 8/14: South Willow St. (Shasta St. to Baker St.) - Line 63
- Expect closures and detours during work hours.
- Follow posted signs and allow extra travel time.
- No parking in construction zones.
- Avoid the area when possible.
- Limited residential access during work.
- A 24-hour notice will be provided to affected homes and businesses.
Sincerely,
Environmental Protection Division
Department of Public Works
City of Manchester
Address/Location
Manchester, NH: City
Manchester, NH 03101
Contact
Emergency: 9-1-1