Advisory
Sincerely,
City of Manchester
Department of Public Works
DPW Road Work Notice: October 5 - October 9; 7:00 am - 5:00 pm daily
The Manchester Department of Public Works (DPW) will be performing construction and maintenance work at various locations throughout the city from October 2 to October 9. Please see the locations listed below.
Lane Closures or Lane Shifts (traffic to be maintained through work zones)
- Beech St (North St to Bridge St) – Curbing and/or sidewalk work, paving preparation
- Pine St (Valley St to Central St) –Overlay paving
- Various Streets (City-wide) – Cracksealing
- Wilson St (Dix St to Somerville St) – Final cleanup
- Pepperidge Dr (Connecting Rd to Westwood Dr) – Sidewalk and curb work
- Elm St (Concord St to Amherst St) – Pavement markings (crosswalks)
- Granite St (under I-293 overpass) – Paving prep and overlay paving
- S. Willow St (at Weston Rd) – Final cleanup
- Cilley Rd (at Jewett St) – Signal work
- Maple Street (Lake Ave to Bridge St) – Signal work and pilot study
- Construction schedules can change unexpectedly.
- Expect lane/road closures and detours during construction hours.
- Please follow posted detour signs and allow extra travel time.
- Parking will be prohibited when required.
- Drivers and pedestrians should use extreme caution when traveling past work zones, especially at night or in adverse weather when visibility is limited.
- Driveway access to local businesses and homes within closures will be maintained and closely coordinated by the Contractor. If driveway access is temporarily blocked, coordinate with crews or police for property access.
- For lane shifts during construction, follow new lane markings, barricaded routes, or traffic cones and allow extra travel time.
- Whenever possible, we encourage drivers to plan ahead and avoid the construction area.
Sincerely,
City of Manchester
Department of Public Works
Address/Location
Manchester, NH: City
Manchester, NH 03101
Contact
Emergency: 9-1-1
