Advisory
Sincerely,
City of Manchester
Department of Public Works
DPW Road Work Notice: October 12 - October 16; 7:00 am - 5:00 pm daily
The Manchester Department of Public Works (DPW) will be performing construction and maintenance work at various locations throughout the city from October 12 to October 16. Please see the locations listed below.
Road Closures (expect detours)
- Lake Ave (Wilson St to Hall St) – Overlay paving
- Beech St (North St to Bridge St) – Curbing and/or sidewalk work, paving preparation
- Pine St (Valley St to Central St) – Overlay paving and final cleanup
- Various Streets (City-wide) – Cracksealing
- Pepperidge Dr (Connecting Rd to Westwood Dr) – Sidewalk and curb work
- Elm St (Concord St to Amherst St) – Pavement markings (crosswalks)
- Douglas St (Quincy St to approx. 526 Douglas St) – Paving prep and base paving
- Cilley Rd (at Jewett St) – Signal work
- Maple Street (Lake Ave to Bridge St) – Signal work and pilot study
- Pine St (at Auburn St) – Signal work
- Construction schedules can change unexpectedly.
- Expect lane/road closures and detours during construction hours.
- Please follow posted detour signs and allow extra travel time.
- Parking will be prohibited when required.
- Drivers and pedestrians should use extreme caution when traveling past work zones, especially at night or in adverse weather when visibility is limited.
- Driveway access to local businesses and homes within closures will be maintained and closely coordinated by the Contractor. If driveway access is temporarily blocked, coordinate with crews or police for property access.
- For lane shifts during construction, follow new lane markings, barricaded routes, or traffic cones and allow extra travel time.
- Whenever possible, we encourage drivers to plan ahead and avoid the construction area.
Sincerely,
City of Manchester
Department of Public Works
Address/Location
Manchester, NH: City
Manchester, NH 03101
Contact
Emergency: 9-1-1
